What happens on site reaches the numbers

A delay is not an administrative event — it is a cost. An unclosed snag is retention that does not release. An old drawing built to is rework. These modules tie the site to the figures, so the decision rests on both.

Schedule — Al Falaj B2 Baseline frozen Schedule performance index 0.94 Progress vs baseline Actual progress 68% Planned on baseline 72% Delay supported by letters 11 days Open handover snags 23 Drawings at current revision 146
Illustrative screen — the figures are invented, not customer data. The actual screen varies with the modules you have open.
Critical pathwith a frozen baseline to compare
SPIschedule performance from earned value
One revisioncurrent — the rest archived
Numberedevery inbound and outbound logged

The questions it answers

The questions that turn into money two months later.

Delay

"How far behind are we?"

The baseline is frozen and actual progress compares against it — and the schedule performance index tells the story in one number.

Cause

"Whose delay is it?"

Each delay carries its cause, its owner and its documents — so a claim is supported, and a delay caused by the client is an extension of time rather than a penalty.

Quality

"Were those snags fixed?"

A snag with its zone and severity; the contractor claims the fix and the owner accepts it — no "it’s been done".

Drawings

"Which revision was it built to?"

One current revision per drawing, and a register of every revision with its date and reason. So work built to an old copy is never untraceable.

What is inside

Six modules for managing execution.

Schedule & delays Activities, dependencies and critical path, a frozen baseline, and delays with their causes.
HSE & quality Incidents, injuries and near-misses with corrective actions, and scored safety inspections.
Drawings & revisions Drawings by discipline, with revisions carrying status, date and reason.
Risk register Risks scored from likelihood and impact, with an owner and a response plan.
Handover & warranty Handover snags by zone, a fix-and-accept cycle, and the warranty period.
Correspondence A numbered register of inbound and outbound, plus RFIs, material approvals and site instructions.

How it connects to the rest

No module works alone. These are the links that keep the numbers consistent.

Project costing

Activities are tied to project items — so a delay shows in cost, not only in the schedule.

Certificates

The progress percentage you certify is the same one in the schedule — never two numbers.

Handover & retention

Retention release is tied to closing out handover snags.

Correspondence & claims

The delay letter and the RFI, with their dates, are the evidence behind a claim when you need one.

Try it on a live project

A project under construction: its schedule, its snags and its drawings — and watch the delay become a number.